Project description

HASLINGER STAHLBAU erected the roof truss of a new cell production hall for Bosch Solar Energy AG at the Arnstadt location in Thuringia, Germany.

 

The two-aisled building, with penthouses perched over the halls, measures 252 x 60 m and is 12 and 19 m high. The roof truss is comprised of frameworks and purlins. Shed structures were placed on the purlins serving both for lighting and also as the bearing structures for photovoltaic elements. A maintenance level of approx. 12.000 m2 dimensions is suspended from the framework. The bearing structure was assembled in 6 weeks only.