Project description

Architecture in focus!

 

HASLINGER STAHLBAU convinced the client with its precise planning, even more precise implementation and swift assembly of the dome and the mall roofing– all carried out amidst and over the heads of the busy shopping crowds. The dome was test assembled in the works to detect any potential deviations and correct these immediately if they occurred. Care was taken in the planning to ensure that only the most essential welding work would be done on site. Following assembly the entire steel structure was given a protective coating. The final glazing phase for the entire steel structure was not included in the HASLINGER STAHLBAU scope of services.

Project location