Klagenfurt (A)

HL-AG BRIDGES

In 2004 HASLINGER constructed three bridges for the Koralmbahn Project of HL-AG in the Klagenfurt-Althofen construction stage. The overhead crossings over the Glan, Gurk and the Südring were all executed as steel or steel compound bridges. In so doing HL-AG benefited from the high economic efficiency of steel.


FACTS:

Glan bridge:
Steel weight: 240 tons
Length: 29 metres
Width: 6.5 metres

Gurk bridge:
Steel weight: 180 tons
Length: 76 metres
Width: 6.5 metres

Südring bridge:
Steel weight: 110 tons
Length: 52 metres
Width: 6.2 metres


 

 

Home BUSINESS Bridge building