over the BN4 near Glaubendorf (A)
Railway bridge
A prerequisite of extremely short assembly times is perfect assembly planning!
In the course of bypassing Glaubendorf, the new federal road crosses the operational railway line, the railway bridge was thus pre-assembled next to the stretch of road and replaced during a total closure period of only 4 days.
|
|
FACTS:
Three-bay steel bridge
Span: 16 m, 42 m, 16 m
Width: 6.9 m, 8.6 m, 6.9 m
Steel weight: 360 t
Construction time: 26 weeks
|
|