Leipzig (D)

BMW Leipzig

Since 2003 the third BMW series has been assembled at the Leipzig location. Due to the short construction time and the versatile requirement profile, BMW opted for a steel hall, which was constructed just-in-time by HASLINGER.


FACTS:

Steel weight: 14,500 tons
Grid dimensions: 18.75 metres
Length: 600 metres
Width: 400 metres
Surface: 92,000 square metres

 

Home BUSINESS Hall construction