Wien (A)

Connect Austria

In 2001 HASLINGER was commissioned to convert and newly build the constructions of the office building of Connect Austria Gesellschaft für Telekommunikation GmbH. The existing hall construction had to be dismantled and replaced by a new one in a very short time. The dismantling work took place under aggravated conditions, as the network operator’s control centre was below the new construction.


FACTS:

Steel weight:  445 tons with fire protection F 90
Dismantling work
Reinforcement of the existing solid structure
Glass façades and trapezoid tin roof
Total construction time:  8 months

 

 

Home BUSINESS Hall construction