The very short construction time once again proves the flexibility of the steel construction method.
The half-timber framed binders are connected with the ferro-concrete struts via inserts. The salient panels serve as subconstruction for the trapezoid tin supporting shell. Our scope of performance also comprised the supply and assembly of the canopy constructions of the entire building project.
FACTS:
6 halls
Ground plan surface: 17,700 m2
Steel construction: 1,000 t
Supply building (with mezzanine ceiling)
Ground plan surface: 2,550 m2
Steel construction (partially in the composite construction method): 600 t
4 months construction time