Salzgitter (A)

SMS DEMAG

The Peine-Salzgitter Group expanded its location in Salzgitter by adding a recycling plant extension for the Kontibeize and entrusted HASLINGER with the job. Due to many years of experience in industrial plant building, HASLINGER was commissioned to supply and assemble the steel construction.  The site is broken down into recycling plant, tank farm and loading bay.  The major challenge in implementing this project was the extremely short assembly time of only 10 weeks.


FACTS:

Steel weight: 700 tons
Length recycling plant: 12 metres
Length tank farm: 20 metres
Length: loading bay: 9 metres
Width: 33 metres
Height recycling plant: 30 metres
Height tank farm: 20 metres
Height loading bay: 7.50 metres

 

Home BUSINESS Plant engineering