Austria | Trumau / Loosdorf / Stockerau

The distribution centres of the Hofer KG branches in Trumau, Stockerau and Loosdorf were expanded.
In the course of these three projects, HASLINGER STAHLBAU prevailed over its competitors. The main reason for this was that he building statics were developped internally while preparing the bid. These alternative solutions enabled it to make the most cost-effective offer for the client overall.
The three building projects were executed over the course of approximately 18 months, sometimes in parallel.
The projects comprised HASLINGER STAHLBAU's entire range of services, from profile and connection statics, workshop planning and construction - including anti-corrosion protection - to assembly.
| STEEL WEIGHT: | 1.800 t |
| ROOF AREA: | 51.000 m² |
| LENGTH: | 200 / 195 / 140 m |
| WIDTH: | 180 / 180 / 40 m |
| HEIGHT: | 14 m |