BMW Regensburg Supply Centre

||

Germany | Regensburg

Projects>Hall Construction>BMW Regensburg Supply Centre

Project description

In 2013, HASLINGER STAHLBAU erected a new logistics building for the BMW factory in Regensburg with a surface area of approximately 30,000 m². The complete roof construction consists of primary and secondary trusses. These are mounted on tensioned reinforced concrete supports.

 

The structure was supplied to the construction site with a single-layer final coat. There was no final painting on site.

 

The services rendered by HASLINGER STAHLBAU included the technical work, manufacture, supply and assembly of the steel construction.

Project views

Keyfacts

Steel weight:1.200 t
Length:231 m
Width:128 m

Height:

10,7 m