BMW Steyr

||

Austria | Steyr

Projects>Hall Construction>BMW Steyr

Project description

BMW extended building 83.x and a logistics bridge to building 50.0 at its site in Steyr.

 

The services rendered by HASLINGER STAHLBAU included the manufacture, supply and assembly of the steel construction and the trapezoidal sheet-metalcovering.

 

The biggest challenge was the logistics bridge. This was made from 4 pieces of load-bearing trusses with a height of 5 m and lengths of up to 37 m. A task that HASLINGER STAHLBAU was able to implement with its usual precision and high quality.

Project views

Keyfacts

Steel weight:350 t
Length:48 m
Width:45 m

Building height:

15 m