Austria | Kapfenberg
Böhler Edelstahl GmbH erected a new bright-drawn steel finishing hall at its site at Deuchendorf/Kapfenberg.
Regardless of the snowy winter of 2012-2013, HASLINGER STAHLBAU implemented the load-bearing structure made of steel trusses with a free span of over 30 m, as well as the complete hall covering, consisting of sandwich panels on the roof and wall, with wall lighting made of polycarbonate multi-walls and smoke and heat extraction fans, in just 12 weeks.
The project is further proof of the enormous capability of HASLINGER STAHLBAU.
Steel Weight: | 650 t |
Length: | 140 m |
Width: | 32 m |
Height: | up to 19 m |
Roof Covering: | 4.800 m² |
Wall Cladding: | 2.500 m² |
Wall Lighting: | 500 m² |