Austria| Ebenthal
THE VISION:
A steel hall needs to be realisted for the company Lesjak. An office wing ist integrated into the hall construction.
THE REALITY:
As well as the steel structure, HASLINGER STAHLBAU supplied the whole of the hall cladding, including continuous rooflights, the smoke and heat ventilation system, and sectional doors.
Hall Floor Area: | 1.500 m² |
Canopy: | 340 m² |
Steel Installed: | 90 t |