OM Knittelfeld BA 3

||

Austria| Spielberg near Knittelfeld

Projects>Hall Construction>OM Knittelfeld BA 3

Project description

For OM (Obersteirische Molkerei) HASLINGER STAHLBAU realised an extension to the cheese ripening room in Spielberg in Styria.

The scope of services consisted of the production, supply and assembly of the 28-metre-long, hot-dip galvanised truss girders for the roof supporting structure, the hall, various steel mesh footbridges in the roof space, as well as platforms and substructures for the air conditioning.

Once again we were able to delight OM, our customer of many years, with our performance.

Project views

Keyfacts

Steel weight180 to
Length64 m
Width64 m
Height12 m
Floor space4.096 m²
Span width28 m