Austria | Grieskirchen
As part of a consortium, HASLINGER STAHLBAU and Schmid Holzbau carried out the construction of a new manufacturing hall for cathodic dip coating (CDC) on behalf of Pöttinger in St. Georgen near Grieskirchen.
The services provided primarily included steel construction work performed by HASLINGER as well as wood construction work implemented by Schmid Holzbau. The newly constructed bays were seamlessly integrated into the existing building complex, creating a harmonious connection between the new and old structures.
The hall represents a successful combination of steel trusses, which were manufactured by HASLINGER, a CLT timber façade and a trapezoidal sheet metal roof, which was designed by Schmid Holzbau.
Steel Weight: | 315 t |
Length: | 100 m |
Width: | 60 m |
Heigth: | 15 m |
Span: | 25 m |
Roof Area: | 6.000 m² |
Axis Grid: | 25 x 20 m |
Construction Period: | 2 months |