Puck Body Shop Hall

||

Austria| St. Veit an der Glan

Projects>Hall Construction>Puck Body Shop Hall

Project description

On the instructions of Karosserie PUCK GmbH, HASLINGER STAHLBAU supplied and assembled a steel construction for the extension to the existing body shop.

 

As well as the supporting steel construction, the scope of work included the complete roofing in the form of a flat roof construction, and the facade claddings of mineral wool panels which formed the partitions. In addition, the existing building was clad and visually integrated with a facing shell of composite aluminium panels. Here HASLINGER STAHLBAU supplied the cantilevered steel substructure, which simulates the spatial effect of the facade cladding by means of various inclinations and doglegs.

Project views

Keyfacts

STEEL WEIGHT:120 to
ROOF AREA:1000 m²
WALL AREAS:1000 m²