Shapetec Wundschuh

||

Austria | Wundschuh

Projects>Hall Construction>Shapetec Wundschuh

Project description

Anton Paar GmbH extended its Shapetec factory at its Wundschuh site with an additional production hall.

 

In September 2014, HASLINGER STAHLBAU was commissioned with the construction of the hall.

 

The services rendered by HASLINGER STAHLBAU included the manufacture, supply and assembly of the steel construction, consisting of profile supports, load-bearing trusses and the required stabilisation bracing.

Project views

Keyfacts

Steel weight:180 t
Length:80 m
Width:56 m

Surface Area:

4.480 m²