Austria | Weißenstein

In 2002 HASLINGER STAHLBAU constructed a new central distribution warehouse for Hofer KG at the Weißenstein location, consisting of a refrigerated and dry storage.
The clamped struts with binding beams rest on the underspanned binders. HASLINGER STAHLBAU's scope of delivery also included the 45,000 m² of large trapezoid tin supporting shell as well as the steel construction for the technical clip. Condenser platforms, including grating layer, banisters and canopies, were also delivered.






| Steel weight:: | 2.500 t |
| Total built-up area: | 45.000 m² |
| Spacing: | 20 x 15 m |

