Omya PCC Drying Plant

||

Austria | Golling

Projects>Plant engineering>Omya PCC Drying Plant

Project description

HASLINGER STAHLBAU built an industrial plant for the manufacture of precipitated powder calcium carbonates (PCC) for Omya GmbH at its Gummern site. HASLINGER STAHLBAU was responsible for the steelwork and the hall shell, including the doors, windows and fire doors.

 

The entire facility consists of five parts of different heights (production plant, silo and pallet equipment, rubbish dump and lorry loading), which are connected to each other. The service also included a 30 m long pipe bridge. The total construction period lasted for approximately five months.

Project views

Keyfacts

STEEL WEIGHT600 t
AREA2.000 m²
LENGTH96 m
WIDTH18 / 24 m
HEIGHTup to 28 m