Austria | Vienna
On the instructions of Kremsmüller Industrieanlagen KG, HASLINGER STAHLBAU planned, manufactured and assembled various platform structures, silo towers and pipe bridges for a new sludge combustion system for Wien Energie in the Simmeringer Haide.
The cramped space conditions were particularly challenging during the assembly, as the new structures had been designed to be installed between existing installations or inside buildings.
In total an additional 2,250 m² of gratings and around 1000 running metres of railings were installed.
The entire construction period for the individual sections was 13 months.