Abford House

||

Great Britain | London

Projects>Specials>Abford House

Project description

THE VISION:

 

A nine-floor building meeting all the requirements of a modern office building was to be erected in the middle of London. HASLINGER STAHLBAU’s steel girders are not only the high-quality load-bearing elements of the project, but also its design highlight.

 

THE REALITY:

 

The central location of the office building and the very busy streets around the construction site made way for a new level of planning and logistical challenges. As always, HASLINGER STAHLBAU was able to master all challenges and delivered all pre-assembled parts on time.

Project views

Keyfacts

Steel weight:74 t
Length:28 m
Width:30 m
Highest point:50 m