The three-field sports hall was built at the primary and secondary modern school in Munich in 2014.

 

HASLINGER STAHLBAU was commissioned with the delivery and assembly of a ceiling construction, consisting of steel load-bearing braces and the sub-construction for the suspended ceiling, as well as the fire-resistant paint. The individual parts of up to 32 m length were pre-manufactured and supplied to the site.

Particular attention had to be paid to the logistical processes due to the limited space at the installation site.

Project views

Keyfacts

Steel Weight:210 t
Length:45 m
Width:32 m
Surface Area:1.440 m²