Germany | Munich

The three-field sports hall was built at the primary and secondary modern school in Munich in 2014.
HASLINGER STAHLBAU was commissioned with the delivery and assembly of a ceiling construction, consisting of steel load-bearing braces and the sub-construction for the suspended ceiling, as well as the fire-resistant paint. The individual parts of up to 32 m length were pre-manufactured and supplied to the site.
Particular attention had to be paid to the logistical processes due to the limited space at the installation site.





| Steel Weight: | 210 t |
| Length: | 45 m |
| Width: | 32 m |
| Surface Area: | 1.440 m² |