Austria | Zipf
The new crossing bridge on the ÖBB Vienna-Salzburg route was built using a special construction method. This involved a framework construction with diagonal shafts pointing outwards and purely reinforced concrete bolts in the outer zones with a composite bar over the ÖBB route.
The steel box girders of the composite bar were made from corrosion-resistant steel S355JOW (CORTEN). The steel girders were supplied in one piece of approx. 32 metres in length and were transported on a temporary frame during brief track closures. The steel girders were prevented from tilting during assembly using a HVL system specially designed by HASLINGER STAHLBAU.
HASLINGER STAHLBAU is particularly proud of the construction of these girders because each girder has a different arch (at greater height and on the plan) but fits exactly, in spite of this challenge.
STEEL WEIGHT: | 80 t |
STEEL PARTS LENGTH: | 32 m |
BRIDGE LENGTH: | 45 m |
WIDTH: | 10 m |
HEIGTH: | 11 m |