Seebach Bridge

||

Austria | Waidhofen/Ybbs

Projects>Bridge building>Seebach Bridge

Project description

On the instructions of ÖBB, HASLINGER STAHLBAU constructed a new railway bridge across the River Seebach and the municipal road in Waidhofen an der Ybbs.

 

The new steel bridge was transported to the installation site in two sections by special transports, and was lifted by means of a truck-mounted crane. The installation seams were welded on-site in shift operations and the corrosion protection was applied to them.

 

The work on-site was realised and successfully completed within the stipulated time window of just 6 days.

Project views

Keyfacts

Steel Weight:133 t
Span:40 m
Individual Span:20 m
Width including the
walkways on both sides:
7,15 m