Germany | Peine
HASLINGER STAHLBAU supplies production hall for steel mill
In 2008, HASLINGER STAHLBAU was awarded the contract for the planning, design, construction and assembly of the furnace hall for a new electric melting furnace of Peiner Träger GmbH in Germany. The construction project was part of a major extension of the plant.
The overhead cranes installed in the hall have a lifting capacity of up to 400 tons. As provided in the plan, the entire steel structure is without additional corrosion protection.