Peiner Träger Ofenhalle EAF

||

Germany | Peine

Projects>Power plant construction>Peiner Träger Ofenhalle EAF

Project description

HASLINGER STAHLBAU supplies production hall for steel mill

 

In 2008, HASLINGER STAHLBAU was awarded the contract for the planning, design, construction and assembly of the furnace hall for a new electric melting furnace of Peiner Träger GmbH in Germany. The construction project was part of a major extension of the plant.

 

The overhead cranes installed in the hall have a lifting capacity of up to 400 tons. As provided in the plan, the entire steel structure is without additional corrosion protection.

Project views

Keyfacts

Steel weight:3.800 t
Length:62 m

Width:

41 m
Height:49,6 m